SUNDT HOME
PORTAL HOME
LOGIN
PREQUALIFICATION
Project Name:
Camp Lejeune Wallace Creek Bachelor Enlisted Quarters P138
Bid Date:
Apr 27, 2012
2:00 PM EDT
Description:
Constructs a multi-story bachelor enlisted quarters (BEQ) with 134 2+0 rooms. Construction includes interior and exterior concrete masonry unit walls on pile foundations with structural steel framing, reinforced masonry walls, brick veneer, reinforced concrete foundation and floors and stairwell extensions for roof access. Project includes a recreation shelter, an equipment drying structure and a personal equipment cleaning station. Built-in equipment includes a passenger/freight elevator and fire pump with generator backup. Site preparation includes site clearing, excavation and preparation for construction. Paving and site improvements include site preparation, grading, landscaping, sidewalks, curbs, parking, roadways, fencing and storm-water drainage. Also included are lighted basketball and volleyball courts, picnic shelter and barbeque pit. Sustainable design principles will be included in the design and construction of the projects in accordance with Executive Order 13123 and other laws and Executive Orders. Facilities will meet LEED ratings and comply with Energy Policy Act of 2005. Low Impact Development will be included in the design and construction of this project. This project will provide Anti-Terrorism (AT) features and comply with AT regulations, physical security and progressive collapse mitigation in accordance with DOD Minimum Anti-Terrorism Standards for Buildings.
Project Documents
Estimator:
Monty Suttle
Mouse click on cross hairs to expand folders to the next level of detail
There are no Documents currently associated with this Project Estimate.
Bid Documents
There are no Bid Notices currently associated with this Project Estimate.
Ajax framework provided by
zapatec