SUNDT HOME PORTAL HOME LOGIN PREQUALIFICATION

 
Project Name: Fort Hood Battalion Operational Readiness Training Complex PN 65374 Bid Date: May 3, 2012
2:00 PM CDT
 
Description: Design-Build of transient Battalion Headquarters, transient Non-Commissioned Officers (NCO) and Officers’ Quarters, transient Barracks locatedat North Fort Hood, TX. Approximately 200,000 SF includes building information systems, fire protection and alarm systems, and energy monitoring and control systems (EMCS) connection. Sustainable design and development (SDD) and Energy Policy Act of 2005 to include the demolish 12 buildings (51,248 SF); features shall be included. Supporting facilities include site development, utilities, and connections, lighting, paving, parking, walks sotrm drainage, landscaping, and signage. Heating will be provided by self-contained systems. Estimated air conditioning is 778 tons. Measures in accordance with the Deparment of Defense (DoD) Minimum Antiterrorism for Buildings standards shall be provided. Comprehensive building and furnishings related interior design services are required.  
 
Project Documents Estimator: David Trovillion  
Mouse click on cross hairs to expand folders to the next level of detail
There are no Documents currently associated with this Project Estimate.
 
 
 
 
 
Bid Documents  
There are no Bid Notices currently associated with this Project Estimate.
 
 
 
 
 
 
 
Ajax framework provided by zapatec